INDUSTRIAL

BAKER HUGHES BAKER HUGHES BAKER HUGHES BAKER HUGHES

BAKER HUGHES - JUBAIL CHEMICAL PLANT

The Engineering, Procurement & Construction of a Chemical Plant to Supply Chemicals to the upstream and downstream Oil & Gas Production Industries - covering a wide range of demulsifiers, corrosion inhibitors, scale inhibitors, etc.


245,050,000.00 SAR

Aramco Aramco Aramco Aramco

Land Rig Manufacturing Initiative - ARM

The Project aims to provide a world-class Facility in manufacturing oil drilling Land Rigs and its components to secure the Companies drilling operations in Middle-East and Northern Africa (MENA) region at a competitive cost. The facility will deliver onshore rigs with vertical integration to Casting, Forging, and Precision Machineries as needed. The Facility shall be undertaken by a joint venture of Saudi Aramco and National Oilwell Varco (NOV). The Joint Venture shall aim to produce ten rigs per year (maximum) with five rigs anticipated to be off-taken by the joint venture and another five rigs to be exported to the MENA Region. Click HERE for more details.


375,000,000.00 SAR

Al Jomaih Beverages Co. Al Jomaih Beverages Co. Al Jomaih Beverages Co. Al Jomaih Beverages Co.

ABC Al Khalldia Complex Office Building - Al Jomaih Beverages Co. (PEPSI Cola)

Construction for head office building at eastern province consist of (ground floor and first floor) Scope of work includes Civil, Structural and Architectural. Erection of PEB works including the MEP utilities (AC, firefighting, fire alarm, electrical panel board, data system, drainage and water supply).



Oil and Gas Project

An EPC Project of a leading Oil and Gas International Company comprising of a Center for Maintenance, Offices, and Warehouses which involves more than 15 buildings.
"We regret that we cannot give more information about this project due to the non-disclosure agreement that we have signed with the client."


400,000,000.00 SAR

SIEMENS Enegry Hub SIEMENS Enegry Hub SIEMENS Enegry Hub SIEMENS Enegry Hub

SIEMENS Enegry Hub

The project, Siemens Energy Hub Dammam, owned by Siemens Arabia is located at the 2nd Industrial City of Dammam which can be accessed from the Dhahran-Abqaiq highway. The project consists of a manufacturing facility which employs pre-engineered steel building construction, an office building of concrete construction in addition to several ancillary smaller structures and pre-cast boundary wall. Its rough area is 51,250 m 2 and the target construction period is 13 months.


90,000,000.00 SAR

Baker Hughes Baker Hughes Baker Hughes Baker Hughes

Baker Hughes - Christensen Saudi Ltd.

BOT Extension Project.


40,000,000.00 SAR

Weatherford, Saudi Arabia Weatherford, Saudi Arabia Weatherford, Saudi Arabia Weatherford, Saudi Arabia

Weatherford, Saudi Arabia

Turnkey construction of the new Weatherford Base located at Abqaiq Road, Dammam Second Industrial with total lot area of 100,000 sqm. The scope of work are Civil, Structural, Erection of Pre Engineering Building, Electrical, Low Current Systems such as Access Control, Fire Alarm Systems and BMS system and Mechanical Works included HVAC, Exhaust fan, Fire fighting etc...


200,000,000.00 SAR

Weatherford, Abu Dhabi Weatherford, Abu Dhabi Weatherford, Abu Dhabi Weatherford, Abu Dhabi

Weatherford, Abu Dhabi

60,000,000.00 SAR

United Group Logistics Center United Group Logistics Center United Group Logistics Center United Group Logistics Center

United Group Logistics Center

The project site is located in Al Khobar, Eastern Province with an area approximately 21,200 sq/m. The project is for reconstruction of a facility for cold storage and distribution of food products, and office zone having combined footprint of circa 11370 sq/m plus ancillary buildings.


20,000,000.00 SAR

G.E. Tamimi G.E. Tamimi G.E. Tamimi G.E. Tamimi

G.E. Tamimi

16,100,000.00 SAR

Al Abniah Al Abniah Al Abniah

Al Abniah Precast Factory

Turnkey construction for the new Precast Factory in Dammam Industrial Area which is the biggest Precast Factory in the Middle East. The Scope of work is to provide civil, structural, general building works, electrical, plumbing and mechanical services, site work and all other works for the construction and completion of the factory and associated facilities. The duration of the contract is 12 months. The project comprising of various amounts of work for the construction of the following: 1. Main Factory Building: 2. Office Building: 3. Generator Building 4. Cafeteria Building 5. Staff praying building 6. Underground tanks 7. Batch plant 8. Guards Houses and Main Base entrance guard house.


90,000,000.00 SAR

Christensen Saudi Ltd Christensen Saudi Ltd Christensen Saudi Ltd Christensen Saudi Ltd

Baker Hughes - Christensen Saudi Ltd.

Design & Construction of a 15,000m² of Workshop & Office facilities for a Multi-national Oil Field Services Company. Work includes development of 105,000m² of land, associated car parking, paved area, external works, provision of all Underground and Aboveground Electro-mechanical utilities for Building & Site.


130,000,000.00 SAR

SHARQ SHARQ SHARQ SHARQ

Eastern Petrochemical Co. (SHARQ)

SHARQ 3rd Expansion Offsite & Utilities Project-Design & Construction of 2,500m² steel framed control building in a live plant area. Work includes provision of all services such as civil, architechtural, electro-mechanical, fire prevention and protection etc.


18,000,000.00 SAR

Middle East Power Company Middle East Power Company Middle East Power Company

Middle East Power Company

Turn-key Construction of a 20m height 4,000m² Gas & Steam Turbine Factory in Dammam posing sophisticated challenges such as the installation of two 150-ton overhead cranes, installation of Acid Pickling Tanks, Air Scrubbers with 20m high Exhaust Stack etc.


25,000,000.00 SAR

Olayan Saudi Holdings Atlas Company Olayan Saudi Holdings Atlas Company Olayan Saudi Holdings Atlas Company Olayan Saudi Holdings Atlas Company

Olayan Saudi Holdings Atlas Company

Turn-key Construction of 6,000m² of Offices, Warehouses & Workshops, comprising of Dynamo Meter Testing Facility, & all Electro-Mechanical works.


7,000,000.00 SAR

Zamil Steel/Sumitomo Zamil Steel/Sumitomo Zamil Steel/Sumitomo Zamil Steel/Sumitomo

Zamil Steel / Sumitomo

Erection of Structural and Open Web Steel Joist for a large Warehouse 110,000m² in area. The feature of the Warehouse is column free span up to 30 meters in length. The Building is the largest single pitch roofing structure in the world.


12,000,000.00 SAR

MHI Rabigh MHI Rabigh MHI Rabigh MHI Rabigh

Zamil Steel Industries MHI Rabigh

16000m² erection of Pre-Engineered/Steel Building upto 24m high complete with all roof and wall accessories for Petro Rabigh.


4,000,000.00 SAR