Head Office Renovation for Arabian Drilling Company - ADC
Dismantling all offices internal dry wall, doors, ceiling tiles and Floors tiles replacing with gypsum ceiling as per design and Marble flooring.
Dismantling all existing utility lines including supply water lines , firefighting system and all related MEP works replaced with new material including as per project specs including installation and testing.
Removal of existing A/C duct and replace with a new one as per design drawing and specs.
Installation of wood and leather wall cladding.
Supply and installation of glass sliding doors.
Supply and installation of glass partition with wooden door.