OFFICE BUILDING
Head Office Renovation for Arabian Drilling Company - ADC
- Dismantling all offices internal dry wall, doors, ceiling tiles and Floors tiles replacing with gypsum ceiling as per design and Marble flooring.
- Dismantling all existing utility lines including supply water lines , firefighting system and all related MEP works replaced with new material including as per project specs including installation and testing.
- Removal of existing A/C duct and replace with a new one as per design drawing and specs.
- Installation of wood and leather wall cladding.
- Supply and installation of glass sliding doors.
- Supply and installation of glass partition with wooden door.
- Construction of safe haven room.
- Supply and installation of bullet proof door.